ASTERO design department has extensive experience in design. In the design process, the team of ASTERO designers uses modern software complexes and equipment allowing the Customer’s future Object in 2D and 3D to be simulated. We specialize in the following sections of design documentation in the graphic and text parts of capital construction objects:
- AVT — Automation AC — automation and control
- APV — fire water supply automation
- APT — smoke removal system automation or fire extinguishing automation
- AR — Architectural Solutions
- AS — Architectural and construction solutions
- ASTU TER — Automated system for technical accounting of fuel and energy resources
- ATP — Heating unit automation, process flow automation
- ATHh — Production technology automation
- VK – Internal water supply line and sewage
- VPT — Culverts
- GOChS — List of civil defense events, events for preventing emergencies of natural and man-made nature
- GP — Master Plan
- KZh — reinforced concrete structures
- KM — metal structures
- KR – construction solutions
- OV — Heating, ventilation and air conditioning
- OOS — Environmental protection
- (O)PZ — (General) explanatory note
- OS — Fire and security alarm
- PB — Fire safety measures
- POS — Construction organization plan
- PNO – Exterior lighting project
- PT — Fire extinguishing (foam extinguishing)
- CD — Estimate documentation
- SDKU — Monitoring and supervisory control system
- SCS — structured cable networks, i.e. weak current communications and signaling networks
- SM — Estimate for the construction of capital construction objects
- SMIS — Structured system for monitoring and management of engineering networks
- TS — Heat supply
- TH – Manufacturing process
- HS — Cold supply
- EG — lightning and grounding
- EM — Electrical equipment
- EC — Power supply 10 / 0.4 kV
- EN – Exterior electrical lighting
- EO — Electric lighting (internal)
- ES – Electricity supply